NEW NEW NEW - Check out our online shop - NEW NEW NEW
NEW NEW NEW - Check out our online shop - NEW NEW NEW
TSN 4,114 hours
4,000 hours TBO remaining.
The following major components were replaced during the repair:
CT Blades (OHC)
CT Disc (OHC)
CT Vane Ring (OHC)
CC Liner (OHC)
3/4 Bearing Housing (OHC)
Automatic Fuel Control (OHC)
Manual Fuel Control (OHC)
All other Engine Accessories Check + Tested
OROS Aerospace's 'Certified Engine Aftermarket' Program (CEA Program) gives operators confidence and peace of mind that their engine has been extensively inspected and repaired by FAA & EASA Approved P&WC MRO Facilities.
Our 'CEA Program' is a market first for mid-time Serviceable engines, which involves an extensive and invasive shop inspection against the latest OEM Overhaul & Maintenance Manual criteria, after which a Full Performance Test is performed.
Save 20%-30% with OROS Aerospace's' Engine Management Program (EMP).
OROS's EMP utilizes our extensive knowledge and leverages our huge stock of OHC & SV Parts to lower your Engine MRO Costs, Start Saving today!!!
PT6T Overhaul & Inspected Test Fuel Nozzle Sets in Stock for immediate Exchange
P/N 3019536 & P/N 3019537 etc
P/N 3054522-01 & P/N 3054520-01
PT6T Overhaul & Inspected Fuel Accessories in stock. AFCU, MFCU, Pumps and Heaters.
P/N 3244736-8 & P/N 3244735-14
P/N 3244884-3 & P/N 3244883-12
Company Registration Number: 10543529
Copyright © 2020 OROS Aerospace Ltd